Search Serbian, European and international standards. Identify the standard organization, select the standard number or keyword, and complete the search you want. You can also add a standard drafting stage or a committee / national committee that drafted the standard
Plastics — Methyl methacrylate-acrylonitrile-butadiene-styrene (MABS) moulding and extrusion materials — Part 2: Preparation of test specimens and determination of properties
20.99 WD approved for registration as CD
17021-15: 202X Conformity assessment requirements for bodies providing audit and certification of management systems. Part 15 Requirements for healthcare quality management systems
10.20 New project ballot initiated
Road vehicles — Connection interface for pyrotechnic devices, two-way and three-way connections — Part 1: Pocket interface definition
40.20 DIS ballot initiated: 12 weeks
Road vehicles — Connection interface for pyrotechnic devices, two-way and three-way connections — Part 2: Test methods and general performance requirements
40.20 DIS ballot initiated: 12 weeks
Road vehicles — Connection interface for pyrotechnic devices, two-way and three-way connections — Part 4: Pyrotechnic device and harness connector assembly - type 2
40.20 DIS ballot initiated: 12 weeks
Road vehicles — Connection interface for pyrotechnic devices, two-way and three-way connections — Part 5: Pyrotechnic device and harness connector assembly - type 3 (only two-way)
50.00 Final text received or FDIS registered for formal approval
Gas cylinders — Inspection of the cylinder installation, and requalification of high pressure cylinders for the on-board storage of natural gas as a fuel for automotive vehicles
50.00 Final text received or FDIS registered for formal approval
Woodworking machines — Safety — Part 1: Common requirements
50.00 Final text received or FDIS registered for formal approval
Woodworking machines — Safety — Part 10: Building site saws (contractor saws)
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Woodworking machines — Safety — Part 11: Combined machines
40.20 DIS ballot initiated: 12 weeks
Woodworking machines — Safety — Part 12: Tenoning-profiling machines
40.20 DIS ballot initiated: 12 weeks
Woodworking machines — Safety — Part 14: Four-sided moulding machines
40.20 DIS ballot initiated: 12 weeks
Woodworking machines — Safety — Part 15: Presses
40.20 DIS ballot initiated: 12 weeks
Woodworking machines — Safety — Part 16: Table band saws and band re-saws
40.60 Close of voting
Woodworking machines — Safety — Part 17: Edge banding machines fed by chains
40.20 DIS ballot initiated: 12 weeks
Woodworking machines — Safety — Part 18: Log band sawing machines
00.00 Proposal for new project received
Woodworking machines — Safety — Part 2: Horizontal beam panel circular sawing machines
40.60 Close of voting
Woodworking machines — Safety — Part 20: Horizontal cutting cross-cut sawing machines with one saw unit (radial arm saws)
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks