Search Serbian, European and international standards. Identify the standard organization, select the standard number or keyword, and complete the search you want. You can also add a standard drafting stage or a committee / national committee that drafted the standard
Information exchange between BIM and GIS — Part 3: Linking abstract concepts in BIM and GIS standards
40.20 DIS ballot initiated: 12 weeks
Information exchange between BIM and GIS — Part 4: Aligning geometrical representation
20.00 New project registered in TC/SC work programme
Information exchange between BIM and GIS — Part 5: Quality assurance
20.00 New project registered in TC/SC work programme
Fine ceramics (advanced ceramics, advanced technical ceramics) — Determination of bulk density of ceramic powders — Part 3: Dynamic Tap Density
00.00 Proposal for new project received
Fine ceramics (advanced ceramics, advanced technical ceramics) — Test methods for fracture toughness of monolithic ceramics — Single-edge V-notch beam (SEVNB) method
50.00 Final text received or FDIS registered for formal approval
Nanotechnologies — Particle size distribution for cellulose nanocrystals
30.60 Close of voting/ comment period
Oil and gas industries including lower carbon energy — Pipeline transportation systems — Procedures of stress detecting for pipeline in service
30.99 CD approved for registration as DIS
Information exchange between BIM and GIS — Part 2: Part 02: Facilitating data exchange through metadata.
10.00 Proposal for new project registered
Determination of the silanol group content on the surface of fumed silica — Part 2: Thermogravimetric analysis method
20.60 Close of comment period
Ships and marine technology — Test method for marine magnetic compass safe distance
00.00 Proposal for new project received
Soil quality — Determination of selected organotin compounds — Gas-chromatographic method
20.00 New project registered in TC/SC work programme
Sustainable mobility and transportation — Smart operation and maintenance — Part 1: Service role architecture
50.00 Final text received or FDIS registered for formal approval
Sustainable mobility and transportation — Smart operation and maintenance — Part 2: Principles and requirements based on management process
00.00 Proposal for new project received
Sustainable mobility and transportation — Smart operation and maintenance — Part 3: Evaluation and improvement based on maturity model
00.00 Proposal for new project received
Traditional Chinese medicine — Determination of selected Aconitum alkaloids by high-performance liquid chromatography (HPLC)
40.20 DIS ballot initiated: 12 weeks
Traditional Chinese medicine — Lycium barbarum and Lycium chinense fruit
40.20 DIS ballot initiated: 12 weeks
Enterprise modelling and architecture — Constructs for Service Modelling
00.60 Close of review
Uncoupling membranes/matting for ceramic tile installation
20.00 New project registered in TC/SC work programme