Search Serbian, European and international standards. Identify the standard organization, select the standard number or keyword, and complete the search you want. You can also add a standard drafting stage or a committee / national committee that drafted the standard
Shipbuilding — Ship screw propellers — Manufacturing tolerances — Part 2: Propellers of diameter between 0,80 and 2,50 m inclusive
40.60 Close of voting
Dentistry — Hand instruments — Part 1: General requirements
30.60 Close of voting/ comment period
Dentistry — Hand instruments — Part 2: Intra-oral mirrors
10.20 New project ballot initiated
Dentistry — Part 2: General requirements for hinged hand instruments
00.00 Proposal for new project received
Dentistry — Hand instruments — Part 3: Dental tweezers
10.20 New project ballot initiated
Dentistry — Hand instruments — Part 4: Periodontal probe, Explorer
10.20 New project ballot initiated
Dentistry — Hand instruments — Part 8: Extraction forceps
10.20 New project ballot initiated
Acoustics — Hearing protectors — Part 7: Method to measure the response of hearing protectors with high-level impulsive noise on an acoustic test fixture
40.60 Close of voting
Ferrous materials — Heat treatments — Vocabulary
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Plastics — Methods of exposure to laboratory light sources — Part 2: Xenon-arc lamps
20.00 New project registered in TC/SC work programme
Fibre-reinforced plastic composites — Properties and test methods
40.20 DIS ballot initiated: 12 weeks
Plastics — Ion exchange resin — Part 5: Determination of water content by centrifugation
00.60 Close of review
Plastics — Ion exchange resin — Part 6: Determination of exchange capacity of strong-acid cation exchange resins in sodium form
30.20 CD study/ballot initiated
Design of Nuclear Power Plants Against Seismic Events — Part 2: Geotechnical Aspects
00.00 Proposal for new project received
Resilient, textile, laminate and modular mechanical locked floor coverings — Castor chair test
50.00 Final text received or FDIS registered for formal approval
Textile floor coverings — Determination of tuft withdrawal force
30.99 CD approved for registration as DIS
Eco-design principles for posting and delivery packaging
10.99 New project approved
Steel and iron — Determination of sulfur content — Infrared absorption method after combustion in an induction furnace
40.60 Close of voting