Search Serbian, European and international standards. Identify the standard organization, select the standard number or keyword, and complete the search you want. You can also add a standard drafting stage or a committee / national committee that drafted the standard
Rubber or plastics covered rollers — Specifications — Part 3: Dimensional and geometrical tolerances
60.00 Standard under publication
Earth moving machinery — Safety of the intended functionality
20.60 Close of comment period
Aluminium ores — Experimental determination of the heterogeneity of distribution of a lot
20.00 New project registered in TC/SC work programme
Aluminium ores — Preparation of samples
20.00 New project registered in TC/SC work programme
Gas analysis — Comparison methods for determining and checking the composition of calibration gas mixtures — Amendment 1: Software B_LEAST – Performance check for non-linear model functions using alternative computer programs
30.99 CD approved for registration as DIS
Gas analysis — Preparation of calibration gas mixtures using dynamic methods — Part 7: Thermal mass-flow controllers — Amendment 1: Correction of Formula C.4
40.60 Close of voting
Fasteners — Surface discontinuities — Part 1: Bolts, screws and studs for general requirements
00.00 Proposal for new project received
Fasteners — Surface discontinuities — Part 3: Bolts, screws and studs for special requirements
00.00 Proposal for new project received
Hydraulic fluid power — Flange connections with split or one-piece flange clamps and metric or inch screws — Part 1: Flange connectors, ports and mounting surfaces for use at pressures of 3,5 MPa (35 bar) to 35 MPa (350 bar), DN 13 to DN 127
40.60 Close of voting
Fire protection — Automatic sprinkler systems — Part 11: Requirements and test methods for pipe hangers
40.00 DIS registered
Fire protection — Automatic sprinkler systems — Part 12: Requirements and test methods for grooved-end components for steel pipe systems
00.00 Proposal for new project received
Fire protection — Automatic nozzle systems — Part 14: Requirements and test methods for water spray nozzles
40.00 DIS registered
Fire protection — Automatic sprinkler systems — Part 20: Requirements and test methods for non-metallic pipe and fittings
00.60 Close of review
Fire protection — Automatic sprinkler system — Part 9: Requirements and test methods for water mist nozzles
20.00 New project registered in TC/SC work programme
Rotary-shaft lip-type seals incorporating elastomeric sealing elements — Part 6: Specification of elastomeric materials
20.20 Working draft (WD) study initiated
Health informatics — Personalized digital health — Common factors for frailty assessment
60.00 Standard under publication
Implant for surgery — Test method for torsional strength of porous calcium salt bone void filler after preconditioning in deaerated phosphate buffered saline
00.60 Close of review