Search Serbian, European and international standards. Identify the standard organization, select the standard number or keyword, and complete the search you want. You can also add a standard drafting stage or a committee / national committee that drafted the standard
Coal and Coke — Determination of carboxyreactivity
00.00 Proposal for new project received
Sustainable mobility and transportation — Roadside feeding electric road system — Part 1: Service role architecture
50.00 Final text received or FDIS registered for formal approval
Sustainable mobility and transportation — Roadside feeding electric road system — Part 2: Service and operational concept
50.00 Final text received or FDIS registered for formal approval
Sustainable mobility and transportation — Roadside feeding electric road system — Part 3: System component
40.00 DIS registered
Sustainable mobility and transportation – Roadside feeding electric road system — Part 4: Charging fee management
00.00 Proposal for new project received
Rubber hoses and hose assemblies — Textile-reinforced hydraulic types for oil-based or water-based fluids — Specification
30.20 CD study/ballot initiated
Wood and wood-based products - Overview related to the concepts of renewability, reusability, recoverability, recyclability, compostability, biodegradability and circularity – Terminology and existing methodology
10.99 New project approved
Coal — Determination of the thermal stability and thermal fragmentation
00.00 Proposal for new project received
Diesel engines — Fuel injection pumps — High-pressure pipes for testing
30.20 CD study/ballot initiated
Facility management — Management systems — Requirements with guidance for use
40.60 Close of voting
Facility Management — Change Management for Facility Management
20.20 Working draft (WD) study initiated
Drawn steel wire for elevator ropes — Specifications
20.00 New project registered in TC/SC work programme
Facility management — Guidance on strategic sourcing and the development of agreements
50.00 Final text received or FDIS registered for formal approval
Facility management — Performance management framework and measurement
20.00 New project registered in TC/SC work programme
Facility management – Digital operating framework
00.00 Proposal for new project received
Anaesthetic and respiratory equipment — Vocabulary — Amendment 1
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks