Search Serbian, European and international standards. Identify the standard organization, select the standard number or keyword, and complete the search you want. You can also add a standard drafting stage or a committee / national committee that drafted the standard
Mineral insulating oils - Methods for the determination of 2-furfural and related compounds
20.99 WD approved for registration as CD
Application guidance based on the IEC 60364 series - Asynchronous motor starting and protection
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Application guides complying with IEC 60364 - Uninterruptible Power Systems
30.60 Close of voting/ comment period
Electrical installation guide - Part 204: Application guides complying with IEC 60364 - Rotating generators
30.60 Close of voting/ comment period
Electrical installation guide - Part 206: Application guides complying with IEC 60364 - Selection of conductor cross-sectional area and coordination with protective devices
20.99 WD approved for registration as CD
Fibre optic interconnecting devices and passive components - Fibre optic isolators - Part 1: Generic specification
40.20 DIS ballot initiated: 12 weeks
Low-voltage switch mode power supplies - Part 3: Electromagnetic compatibility (EMC)
30.60 Close of voting/ comment period
Insulating materials - Industrial rigid round laminated tubes and rods based on thermosetting resins for electrical purposes - Part 2: Methods of test
20.99 WD approved for registration as CD
Terrestrial photovoltaic (PV) modules - Design qualification and type approval - Part 1: Test requirements
20.99 WD approved for registration as CD
Terrestrial photovoltaic (PV) modules - Design qualification and type approval - Part 1-1: Special requirements for testing of crystalline silicon photovoltaic (PV) modules
20.99 WD approved for registration as CD
Terrestrial photovoltaic (PV) modules - Design qualification and type approval - Part 1-2: Special requirements for testing of thin-film Cadmium Telluride (CdTe) based photovoltaic (PV) modules
20.99 WD approved for registration as CD
Terrestrial photovoltaic (PV) modules - Design qualification and type approval - Part 1-3: Special requirements for testing of thin-film amorphous silicon based photovoltaic (PV) modules
20.99 WD approved for registration as CD
Terrestrial photovoltaic (PV) modules - Design qualification and type approval - Part 1-4: Special requirements for testing of thin-film Cu(In,GA)(S,Se)2 based photovoltaic (PV) modules
20.99 WD approved for registration as CD
Terrestrial photovoltaic (PV) modules - Design qualification and type approval - Part 1-6: Special requirements for testing of metal halide perovskite-containing photovoltaic (PV) modules
20.99 WD approved for registration as CD
Terrestrial photovoltaic (PV) modules - Design qualification and type approval - Part 2: Test procedures
20.99 WD approved for registration as CD
Nuclear power plants - Control rooms - Operator controls
30.60 Close of voting/ comment period
Amendment 1 - Compression and mechanical connectors for power cables - Part 1-1: Test methods and requirements for compression and mechanical connectors for power cables for rated voltages up to 1 kV (U<sub>m</sub> = 1,2 kV) tested on non-insulated conductors
20.99 WD approved for registration as CD
Amendment 1 - Compression and mechanical connectors for power cables - Part 1-2: Test methods and requirements for insulation piercing connectors for power cables for rated voltages up to 1 kV (U<sub>m</sub> = 1,2 kV) tested on insulated conductors