Search Serbian, European and international standards. Identify the standard organization, select the standard number or keyword, and complete the search you want. You can also add a standard drafting stage or a committee / national committee that drafted the standard
Integrated circuits - Measurement of electromagnetic emissions - Part 1: General conditions and definitions
30.20 CD study/ballot initiated
Mechanical structures for electrical and electronic equipment - Outdoor enclosures - Part 3: Environmental requirements, tests and safety aspects
40.20 DIS ballot initiated: 12 weeks
High voltage direct current (HVDC) substation audible noise
20.99 WD approved for registration as CD
Requirements of bidirectional wireless power transfer for electric vehicles
20.99 WD approved for registration as CD
Amendment 2 - Railway applications - Fixed installations - DC switchgear - Part 6: DC switchgear assemblies
60.00 Standard under publication
High-voltage direct current (HVDC) systems - Guidance to the specification and design evaluation of AC filters - Part 2: Harmonic performance aspects
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
High-voltage direct current (HVDC) systems - Guidance to the specification and design evaluation of AC filters - Part 3: Modelling aspects
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Hydraulic machines - Acceptance tests of small hydroelectric installations
20.99 WD approved for registration as CD
Amendment 1 - Electrical accessories - Residual current monitors (RCMs) - Part 1: RCMs for household and similar uses
30.60 Close of voting/ comment period
High frequency inductive components - Electrical characteristics and measuring methods - Part 3: AC loss measured by sinusoidal wave of inductors for DC-to-DC converters
50.00 Final text received or FDIS registered for formal approval
Passive RF and microwave devices, intermodulation level measurement - Part 7: Field measurements of passive intermodulation
40.20 DIS ballot initiated: 12 weeks
Uninterruptible power systems (UPS) - Part 1: Safety requirements
40.99 Full report circulated: DIS approved for registration as FDIS
Uninterruptible power systems (UPS) - Part 5-1: DC output UPS - Safety requirements
20.99 WD approved for registration as CD
Amendment 1 - Uninterruptible power systems (UPS) - Part 5-3: DC output UPS - Performance and test requirements
20.99 WD approved for registration as CD
Cores made of soft magnetic materials - Measuring methods - Part 2: Magnetic properties at low excitation level
30.60 Close of voting/ comment period
Safety of machinery - Application of protective equipment to detect the presence of persons
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Semiconductor devices - Micro-electromechanical devices - Part 51: Test method of electrical characteristics under two-directional cyclic bending deformation for flexible micro-electromechanical devices
40.99 Full report circulated: DIS approved for registration as FDIS
Semiconductor devices - Micro-electromechanical devices - Part 54: Silicon based MEMS fabrication technology – Measurement method of tensile strength of microstructures
30.99 CD approved for registration as DIS