Phone: (011) 7541-421, 3409-301, 3409-335, 6547-293, 3409-310
E-mail: Standards sales: prodaja@iss.rs Education: iss-edukacija@iss.rs Information about standards: infocentar@iss.rs
Stevana Brakusa 2, 11030 Beograd
Main menu

Projects

Search Serbian, European and international standards. Identify the standard organization, select the standard number or keyword, and complete the search you want. You can also add a standard drafting stage or a committee / national committee that drafted the standard

Communication networks and systems for power utility automation - Part 90-28: Specification for subscriber IED to validate received GOOSE and SV messages

50.20   Proof sent to secretariat or FDIS ballot initiated: 8 weeks

TC 57 more

Communication networks and systems for power utility automation - Part 90-29: Physical interfaces of an Intelligent Electronic Device (IED) and its connectivity

30.60   Close of voting/ comment period

TC 57 more

Communication networks and systems for power utility automation - Part 90-32: Use of virtualized environment in IEC 61850 power utility automation system

40.99   Full report circulated: DIS approved for registration as FDIS

TC 57 more

Communication networks and systems for power utility automation - Part 90-34: Using IEC 61850 for power transformer regulation

20.99   WD approved for registration as CD

TC 57 more

Communication networks and systems for power utility automation - Part 90-23: Use of IEC 61850 for microgrid systems

30.20   CD study/ballot initiated

TC 57 more

Communication networks and systems for power utility automation - Part 90-5: Use of IEC 61850 to transmit synchrophasor information according to IEEE C37.118

50.00   Final text received or FDIS registered for formal approval

TC 57 more

Communication networks and systems for power utility automation - Part 90-31: Use Cases for Dynamic Data model

30.60   Close of voting/ comment period

TC 57 more

Conductive power and energy transfer systems for electric vehicles - Part 1: General system and specific Mode 3 EV charging station requirements

40.60   Close of voting

TC 69 more

Conductive power and energy transfer systems for electric vehicles - Part 21-1 Electric vehicle on-board charger EMC requirements for conductive connection to AC/DC supply

50.00   Final text received or FDIS registered for formal approval

TC 69 more

Conductive power and energy transfer systems for electric vehicles - Part 21-2: Electric vehicle requirements for conductive connection to an AC/DC supply - EMC requirements for off board electric vehicle charging systems

30.99   CD approved for registration as DIS

TC 69 more

Conductive power and energy transfer systems for electric vehicles - Part 23: DC electric vehicle supply equipment

30.60   Close of voting/ comment period

TC 69 more

<p>Electric vehicle conductive charging system - Part 23-1: DC electric vehicle supply equipment - Automated connection device</p>

60.00   Standard under publication

TC 69 more

Electric vehicle conductive charging system - Part 23-3: DC electric vehicle supply equipment - Megawatt charging systems

50.60   Close of voting. Proof returned by secretariat

TC 69 more

Conductive power and energy transfer systems for electric vehicles - Part 23-4: Portable DC EV supply equipment

30.60   Close of voting/ comment period

TC 69 more

Conductive power and energy transfer systems for electric vehicles - Part 24: Digital communication between a DC EV supply equipment and an electric vehicle for control of DC charging

30.60   Close of voting/ comment period

TC 69 more

<p>Conductive power and energy transfer systems for electric vehicles – Part 28: Communication between automatic EV supply equipment and vehicles</p>

20.99   WD approved for registration as CD

TC 69 more

Photovoltaic (PV) module performance testing and energy rating - Part 1: Irradiance and temperature performance measurements and power rating

20.99   WD approved for registration as CD

TC 82 more

Photovoltaic (PV) module performance testing and energy rating - Part 2: Spectral responsivity, incidence angle and nominal module operating temperature measurements

50.20   Proof sent to secretariat or FDIS ballot initiated: 8 weeks

TC 82 more