Search Serbian, European and international standards. Identify the standard organization, select the standard number or keyword, and complete the search you want. You can also add a standard drafting stage or a committee / national committee that drafted the standard
Industrial communication networks - High availability automation networks - Part 1: General concepts and calculation methods
30.99 CD approved for registration as DIS
Industrial communication networks - High availability automation networks - Part 2: Media Redundancy Protocol (MRP)
30.99 CD approved for registration as DIS
Industrial communication networks - High availability automation networks - Part 3: Parallel Redundancy Protocol (PRP) and High-availability Seamless Redundancy (HSR)
30.99 CD approved for registration as DIS
Security for automation and control systems – Part 1-1: Overview and Guidance for the IEC 62443 Series
30.60 Close of voting/ comment period
Security for industrial automation and control systems - Part 2-4: Security program requirements for IACS service providers
30.60 Close of voting/ comment period
Security for industrial automation and control systems - Part 4-1: Secure product development lifecycle requirements
30.60 Close of voting/ comment period
Security for Automation and Control Systems - Part 6-1: Security evaluation methodology for IEC 62443-2-4
30.99 CD approved for registration as DIS
Photovoltaic (PV) systems - Requirements for testing, documentation and maintenance - Part 1: Grid connected systems - Documentation, commissioning tests and inspection
40.99 Full report circulated: DIS approved for registration as FDIS
Photovoltaic (PV) systems - Requirements for testing, documentation and maintenance - Part 3: Photovoltaic modules and plants - Outdoor infrared thermography
40.99 Full report circulated: DIS approved for registration as FDIS
Photovoltaic (PV) system - Requirements for testing, documentation and maintenance - Part 4: Photovoltaic modules and plants - Outdoor electroluminescence imaging
50.00 Final text received or FDIS registered for formal approval
Radiation protection instrumentation - Determination of uncertainty in measurement
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Amendment 1 - Photobiological safety of lamps and lamp systems - Part 7: Light sources and luminaires primarily emitting visible radiation
30.99 CD approved for registration as DIS
Material declaration for products of and for the electrotechnical industry
20.99 WD approved for registration as CD
High-current test techniques - Definitions and requirements for test currents and measuring systems
50.60 Close of voting. Proof returned by secretariat
Safety requirements for power electronic converter systems and equipment - Part 2: High Voltage Power electronic converters up to 36 kV a.c. or 54 kV d.c.
40.60 Close of voting
High voltage test techniques - Measurement of partial discharges by electromagnetic and acoustic methods
20.99 WD approved for registration as CD
Railway applications - Current collection systems - Technical criteria for the interaction between pantograph and overhead contact line (to achieve free access)
40.99 Full report circulated: DIS approved for registration as FDIS
Broadband systems operating over EHV/HV/MV/LV electricity grids
00.00 Proposal for new project received