Search Serbian, European and international standards. Identify the standard organization, select the standard number or keyword, and complete the search you want. You can also add a standard drafting stage or a committee / national committee that drafted the standard
Conductive charging of electric vehicles - Contact interface for automated connection device (ACD)
50.00 Final text received or FDIS registered for formal approval
Photovoltaic power generating systems connection with the grid - Testing of power conversion equipment- Part 1: General requirements
40.60 Close of voting
Photovoltaic power generating systems connection with grid - Testing of power conversion equipment - Part 2: Testing environment
20.99 WD approved for registration as CD
Photovoltaic power generating systems connection with grid - Conformity assessment for power conversion equipment - Part 4: Interface protection and fault ride through
20.99 WD approved for registration as CD
Photovoltaic power generating systems connection with the grid - Testing for power conversion equipment - Part 5: Electromagnetic compatibility for low frequency conducted disturbances
40.60 Close of voting
Photovoltaic power generating systems connection with the grid - Testing of power conversion equipment- Part 6: Power control functions and grid support
40.00 DIS registered
Photovoltaic power generating systems connection with the grid - Testing of power conversion equipment- Part 7: Remote configuration, control and monitoring
40.00 DIS registered
Ultrasonics - Shear-wave elastography - Part 2: Preparation and characterization of phantoms for performance and constancy testing
30.60 Close of voting/ comment period
Fixed accessories intended for household and similar purposes that supply power through an interface
40.20 DIS ballot initiated: 12 weeks
Guideline for Switching Reliability Evaluation procedures for Gallium Nitride Power Conversion Devices
40.99 Full report circulated: DIS approved for registration as FDIS
Cooperative Multiple Systems in Connected Home Environments – AAL SOTIF of E/E Systems
20.99 WD approved for registration as CD
Guideline for the adjustment potential evaluation of demand side resources
50.60 Close of voting. Proof returned by secretariat
RTV silicone rubber coated insulators for AC and DC high-voltage applications - definitions, test methods and acceptance criteria
40.99 Full report circulated: DIS approved for registration as FDIS
Robotics for electricity generation, transmission and distribution systems -Part 1-2: State-of-the art and standardization roadmap for electric power system robots
50.60 Close of voting. Proof returned by secretariat
Robotics for electricity generation, transmission and distribution systems - Part 2-1: General Technical Requirements for UAS for Overhead Power Lines Inspection
30.99 CD approved for registration as DIS
Robotics for electricity generation, transmission and distribution systems - Wheeled, tracked or legged robots — Part 3‑21: Overhead transmission line inspection robot - General requirements
20.99 WD approved for registration as CD
Robotics for electricity generation, transmission and distribution systems - Wheeled, tracked or legged robots - Part 3‑31: Land cable tunnel inspection robot - General requirements.
20.99 WD approved for registration as CD