Search Serbian, European and international standards. Identify the standard organization, select the standard number or keyword, and complete the search you want. You can also add a standard drafting stage or a committee / national committee that drafted the standard
Marine Battery Containers - Part 1: Technical Requirements
20.99 WD approved for registration as CD
Marine Battery Containers - Part 2: Connection and Interface System
20.99 WD approved for registration as CD
Batch control - Part 0: Life cycle model for Batch Control
10.20 New project ballot initiated
Sampling and Conditioning LNG for Continuous Analysis
00.99 Approval to ballot proposal for new project
INDUSTRIAL NETWORKS – 5G COMMUNICATION TECHNOLOGY – Part 4: Specification for the deployment of 5G in an IA plant
10.20 New project ballot initiated
INDUSTRIAL NETWORKS – 5G COMMUNICATION TECHNOLOGY – Part 3: Specification of features needed for industrial automation
10.20 New project ballot initiated
Process Automation Device Information Model (PA-DIM) for integration in enterprise systems
00.99 Approval to ballot proposal for new project
IEC Technical Report - Methods of measurement of the magnetic properties of non-oriented electrical steel strip and sheet by means of a small single sheet tester.
00.00 Proposal for new project received
Permanent magnet (magnetically hard) materials – Methods of measurement of the magnetic properties in an open magnetic circuit using a Pulsed Field Magnetometer
10.20 New project ballot initiated
IEC Technical Report on studies of the measurements of the magnetic properties of electrical steels using a single sheet tester with magnetic field strength sensing H-coils
00.00 Proposal for new project received
Short-circuit current in d.c. systems – Part 0 Calculation of currents
10.60 Close of voting
IEC TR 63222-102 Power quality management - Part 102: Developing networks towards power quality standards
00.00 Proposal for new project received
IEC TR 63222-103 Power quality management - Part 103: Distributed Generation Deployment with Power Quality Constraints
00.00 Proposal for new project received