Search Serbian, European and international standards. Identify the standard organization, select the standard number or keyword, and complete the search you want. You can also add a standard drafting stage or a committee / national committee that drafted the standard
Low-voltage switchgear and controlgear - Part 1: General rules
40.99 Full report circulated: DIS approved for registration as FDIS
Low-voltage switchgear and controlgear - Part 4-1: Contactors and motor-starters - Electromechanical contactors and motor-starters
20.99 WD approved for registration as CD
Low-voltage switchgear and controlgear - Part 5-2: Control circuit devices and switching elements - Sensing devices with switching output
30.20 CD study/ballot initiated
Low-voltage switchgear and controlgear - Part 7-2: Ancillary equipment - Protective conductor terminal blocks for copper conductors
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Low-voltage switchgear and controlgear - Part 7-4: Ancillary equipment - PCB terminal blocks for copper conductors
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Low-voltage switchgear and controlgear - Part 7-5: Ancillary equipment - Terminal blocks for aluminium conductors
20.99 WD approved for registration as CD
Calculation of thermally permissible short-circuit currents, taking into account non-adiabatic heating effects
20.99 WD approved for registration as CD
Nuclear facilities - Instrumentation systems important to safety - Radiation monitoring for accident and post-accident conditions - Part 2: Equipment for continuous off-line monitoring of radioactivity in gaseous effluents and ventilation air
50.99 FDIS or proof approved for publication
Nuclear facilities - Instrumentation systems important to safety - Radiation monitoring for accident and post-accident conditions - Part 4: Equipment for continuous in-line or on-line monitoring of radioactivity in process streams
50.99 FDIS or proof approved for publication
Rules for steam turbine thermal acceptance tests - Part 1: High accuracy for large condensing steam turbines
50.00 Final text received or FDIS registered for formal approval
Rules for steam turbine thermal acceptance tests - Part 4: Routine testing
60.00 Standard under publication
Rules for Steam Turbine Thermal Acceptance Tests - Part5 Steam Turbines in Combined Heat and Power (CHP) / District Heating (DH) Cycles
20.99 WD approved for registration as CD
Functional design criteria for a safety parameter display system for nuclear power stations
30.60 Close of voting/ comment period
Nuclear power plants - Control rooms - Design
20.99 WD approved for registration as CD
Radio frequency and coaxial cable assemblies - Part 1-1: Guidance, additional specifications, and test methods for cable assemblies for reference measurements and test fixtures
20.99 WD approved for registration as CD
Arc welding equipment - Part 1: Welding power sources
50.00 Final text received or FDIS registered for formal approval
Amendment 1 - Arc welding equipment - Part 7: Torches
30.60 Close of voting/ comment period