Search Serbian, European and international standards. Identify the standard organization, select the standard number or keyword, and complete the search you want. You can also add a standard drafting stage or a committee / national committee that drafted the standard
Asset Administration Shell for Industrial Applications – Part 3: Security provisions for Asset Administration Shells
40.00 DIS registered
Asset Administration Shell for industrial applications – Part 5: Interfaces
30.60 Close of voting/ comment period
e-Transporters – Part 2-2: Safety requirements and test methods for autonomous cargo e-Transporters
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
E-Transporters - Part 4-1: Electromagnetic compatibility (EMC) requirements and test methods for e-Transporters – Emission
20.99 WD approved for registration as CD
E-Transporters – Part 4-2: Electromagnetic compatibility (EMC) requirements and test methods for e-Transporters – Immunity
20.99 WD approved for registration as CD
Interface requirements of autonomous cargo e-Transporters and cloud platform scheduling system
40.60 Close of voting
LVDC systems - Part 101: DC power distribution system for typical scenarios including industrial applications, data centres and DC-interfaced energy resources
50.00 Final text received or FDIS registered for formal approval
IEC TR 63282-103: LVDC systems - Part 103: Flexible interconnection systems with LVDC
40.99 Full report circulated: DIS approved for registration as FDIS
IEC TR 63282-104-1: LVDC systems - Part 104-1: Power Quality - Voltage characteristics in public LVDC power supply systems
40.99 Full report circulated: DIS approved for registration as FDIS
IEC TR 63282-104-2: LVDC systems - Part 104-2: Power Quality - Voltage characteristics in industrial locations for low-frequency conducted disturbances
40.99 Full report circulated: DIS approved for registration as FDIS
Industrial-process measurement, control and automation - Smart manufacturing - Part 4: Usage of new technologies and standardization
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Power Electronic Converters for Distributed Energy Resources - Part 3: Performance and test methods
20.99 WD approved for registration as CD
High voltage direct current (HVDC) grid systems and connected converter stations - Guideline and parameter lists for functional specifications - Part 1: Guideline
20.99 WD approved for registration as CD
High voltage direct current (HVDC) grid systems and connected converter stations - Guideline and parameter lists for functional specifications - Part 2: Parameter lists
20.99 WD approved for registration as CD
Portable multimedia equipment - Determination of battery duration - Part 1: Powered loudspeaker equipment
40.00 DIS registered
Systems Reference Deliverable (SRD) - Smart Cities Use Case Collection and Analysis: Water Systems in Smart Cities - Part 1: High Level Analysis
20.99 WD approved for registration as CD
Smart city use case collection and analysis - Water systems in smart cities - Part 3: Industry viewpoint
20.99 WD approved for registration as CD
Systems Reference Deliverable (SRD) - Use cases collection and Analysis: Intelligent operations center for Smart Cities - Part 2 : Use Case Analysis
20.99 WD approved for registration as CD