Search Serbian, European and international standards. Identify the standard organization, select the standard number or keyword, and complete the search you want. You can also add a standard drafting stage or a committee / national committee that drafted the standard
200 MeV to 400 MeV superconducting proton cyclotron - General requirements and test methods
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Household appliances network and grid connectivity - Part 1: General requirements, generic data modelling and neutral messages
20.99 WD approved for registration as CD
Household appliances network and grid connectivity - Part 2: Product specific mappings, details, requirements and deviations
20.99 WD approved for registration as CD
Household appliances network and grid connectivity - Part 3-1: Specific Data Model Mapping: SPINE and SPINE-IoT
20.99 WD approved for registration as CD
Household appliances network and grid connectivity - Part 4-1: Communication Protocol Specific Aspects: SPINE, SPINE-IoT and SHIP
20.99 WD approved for registration as CD
Test method for continuous-switching evaluation of gallium nitride power conversion devices
40.99 Full report circulated: DIS approved for registration as FDIS
Solar Trackers - Requirements for the protection of personnel
20.99 WD approved for registration as CD
Maritime navigation and radiocommunication equipment and systems - VHF data Exchange system - Requirements and test methods for shipborne mobile Station
40.20 DIS ballot initiated: 12 weeks
Power system resilience - Part 2:Assessment Guidelines
20.99 WD approved for registration as CD
Surge Arc Suppressor - Part 1: Surge Arc Suppressor (SAS) devices to Protect Power Line Insulation of systems > 1kV a.c.
30.60 Close of voting/ comment period
Machine learning-enabled medical device – Performance evaluation process
30.60 Close of voting/ comment period
Electrical relays - Tests and measurements - Part 0: General and guidance
60.00 Standard under publication
Electrical relays - Tests and Measurement - Part 26: Crosstalk and insertion loss
30.20 CD study/ballot initiated
Electrical relays - Tests and measurements - Part 55: Maximum load breaking capacity
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Fuse-links with DC rated voltage above 1500 V for the protection of DC circuits with short time constants
30.60 Close of voting/ comment period
Artificial Intelligence enabled Medical Devices - Computer assisted analysis software for pulmonary images - Algorithm performance test methods
50.00 Final text received or FDIS registered for formal approval
Reuse of PV modules and circular economy
40.99 Full report circulated: DIS approved for registration as FDIS