Search Serbian, European and international standards. Identify the standard organization, select the standard number or keyword, and complete the search you want. You can also add a standard drafting stage or a committee / national committee that drafted the standard
Decentralized multi-energy systems - Integration of Power-to-X (P2X) systems into decentralized energy systems - Part 2-1: General principles, framework, and use cases
10.60 Close of voting
Virtual Power Plant - Part 4: Primary Frequency Regulation Functional Requirements and Specification
10.60 Close of voting
Decentralized multiple energy systems Part 3-1-Technical Requirements: Energy Management System
10.60 Close of voting
Circuit board assemblies - Part 8: Voiding in solder joints - Best practices
10.20 New project ballot initiated
Test methods for electrical materials, circuit board and other interconnection structures and assemblies - Part 5-507: General test methods for materials and assemblies - Controlled condensation testing
10.20 New project ballot initiated
Thermal Endurance Test Method for Flexible Optic-Electric Circuit
00.99 Approval to ballot proposal for new project
PRINTED BOARDS AND PRINTED BOARD ASSEMBLIES– DESIGN AND USE - Part 8: 3D shape data for CAD component library
00.99 Approval to ballot proposal for new project
Electrical relay as interface for use in power applications (industrial and residential use)
10.60 Close of voting
Requirements and roadmap for DC protection function standardisation
00.00 Proposal for new project received
Insulation co-ordination for HVDC system — Part 1: Definitions, principles and rules
00.99 Approval to ballot proposal for new project
Insulation co-ordination for HVDC system — Part 2: Application guidelines for line commutated converter (LCC) stations
00.99 Approval to ballot proposal for new project
Drafting of publications on electromagnetic field exposure assessment methods
30.99 CD approved for registration as DIS
Information technology – Home Electronic System (HES) application model – GridWise Transactive Energy Framework
00.99 Approval to ballot proposal for new project
Internet of Things (IoT) – IoT application on power distribution system: Architecture and functional requirements
00.99 Approval to ballot proposal for new project
Internet of Things (IoT) – Architecture considerations for IoT, edge and cloud
00.00 Proposal for new project received
(AWI) Internet of Things (IoT) – Guidelines on testing of IoT devices
00.00 Proposal for new project received