Phone: (011) 7541-421, 3409-301, 3409-335, 6547-293, 3409-310
E-mail: Standards sales: prodaja@iss.rs Education: iss-edukacija@iss.rs Information about standards: infocentar@iss.rs
Stevana Brakusa 2, 11030 Beograd
Main menu

Projects

Search Serbian, European and international standards. Identify the standard organization, select the standard number or keyword, and complete the search you want. You can also add a standard drafting stage or a committee / national committee that drafted the standard

Copper and copper alloys - Wrought and unwrought forging stock

50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks

C026 more

Gymnastic equipment - Horses and bucks - Functional and safety requirements, test methods

50.99 FDIS or proof approved for publication

D083 more

Plastics piping systems for water supply, and for drains and sewers under pressure - Polyethylene (PE) - Part 1: General

50.60 Close of voting. Proof returned by secretariat

G061 more

Plastics piping systems for water supply, and for drains and sewers under pressure - Polyethylene (PE) - Part 2: Pipes

50.60 Close of voting. Proof returned by secretariat

G061 more

Plastics piping systems for water supply, and for drains and sewers under pressure - Polyethylene (PE) - Part 3: Fittings

50.60 Close of voting. Proof returned by secretariat

G061 more

Plastics piping systems for water supply, and for drains and sewers under pressure - Polyethylene (PE) - Part 4: Valves for water supply systems

50.60 Close of voting. Proof returned by secretariat

G061 more

Plastics piping systems for water supply, and for drains and sewers under pressure - Polyethylene (PE) - Part 5: Fitness for purpose of the system

50.60 Close of voting. Proof returned by secretariat

G061 more

Building hardware - Mechanically operated locks and locking plates - Characteristics and test methods

50.60 Close of voting. Proof returned by secretariat

U162 more

Wastewater treatment plants - Part 12: Control and automation

50.60 Close of voting. Proof returned by secretariat

U165 more

Wastewater treatment plants - Part 3: Preliminary treatment

50.60 Close of voting. Proof returned by secretariat

U165 more

Wastewater treatment plants - Part 5: Lagooning processes

50.60 Close of voting. Proof returned by secretariat

U165 more

Wastewater treatment plants - Part 8: Sludge treatment and storage

50.60 Close of voting. Proof returned by secretariat

U165 more

Wastewater treatment plants - Part 9: Odour control and ventilation

50.60 Close of voting. Proof returned by secretariat

U165 more

Gas meters - Turbine gas meters

50.60 Close of voting. Proof returned by secretariat

M115 more

Mountaineering equipment - Harnesses - Safety requirements and test methods

50.60 Close of voting. Proof returned by secretariat

D083 more

Workshop fabricated steel tanks - Part 4: Vertical cylindrical single skin and double skin tanks for the aboveground storage of flammable and nonflammable water polluting liquids other than for heating and cooling of buildings

50.60 Close of voting. Proof returned by secretariat

M115 more

Gas-fired sorption appliances for heating and/or cooling with a net heat input not exceeding 70 kW - Part 3: Requirements, test conditions and test methods

50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks

M049 more

Traffic control equipment - Warning and safety light devices

50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks

Z226 more