Search Serbian, European and international standards. Identify the standard organization, select the standard number or keyword, and complete the search you want. You can also add a standard drafting stage or a committee / national committee that drafted the standard
Curtain walling - Air permeability - Performance requirements and classification
50.60 Close of voting. Proof returned by secretariat
Curtain walling - Air permeability - Test method
50.60 Close of voting. Proof returned by secretariat
Builders hoists for persons and materials with vertically guided cages
50.60 Close of voting. Proof returned by secretariat
Gymnastic equipment - Horses and bucks - Functional and safety requirements, test methods
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Plastics piping systems for water supply, and for drains and sewers under pressure - Polyethylene (PE) - Part 1: General
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Plastics piping systems for water supply, and for drains and sewers under pressure - Polyethylene (PE) - Part 2: Pipes
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Plastics piping systems for water supply, and for drains and sewers under pressure - Polyethylene (PE) - Part 3: Fittings
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Plastics piping systems for water supply, and for drains and sewers under pressure - Polyethylene (PE) - Part 4: Valves for water supply systems
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Plastics piping systems for water supply, and for drains and sewers under pressure - Polyethylene (PE) - Part 5: Fitness for purpose of the system
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Wastewater treatment plants - Part 13: Chemical treatment - Treatment of wastewater by precipitation/flocculation
50.60 Close of voting. Proof returned by secretariat
Wastewater treatment plants - Part 3: Preliminary treatment
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Wastewater treatment plants - Part 9: Odour control and ventilation
50.60 Close of voting. Proof returned by secretariat
Mountaineering equipment - Harnesses - Safety requirements and test methods
50.60 Close of voting. Proof returned by secretariat
Workshop fabricated steel tanks - Part 4: Vertical cylindrical single skin and double skin tanks for the aboveground storage of flammable and nonflammable water polluting liquids other than for heating and cooling of buildings
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Aircraft ground support equipment - Specific requirements - Part 3: Conveyor belt vehicles
50.60 Close of voting. Proof returned by secretariat
Ambient air - Standard gravimetric measurement method for the determination of the PM10 or PM2,5 mass concentration of suspended particulate matter
50.60 Close of voting. Proof returned by secretariat
Building acoustics - Estimation of acoustic performance of buildings from the performance of elements - Part 5: Sounds levels due to the service equipment
50.60 Close of voting. Proof returned by secretariat
Testing of hardened concrete - Part 19: Determination of electrical resistivity
50.60 Close of voting. Proof returned by secretariat