Scope

describes the steps recommended to complete a loop check, which comprises the activities between the completion of the loop construction (including installation and point-to-point checks) and the start-up of cold commissioning. Is applicable for the construction of new plants and for expansion/retrofits (i.e. revamping) of E&I installations in existing plants (including PLC, BAS, DCS, panel-mounted and field instrumentation). It does not include a detailed checkout of power distribution systems, except as they relate to the loops being checked (i.e. a motor starter or a power supply to a four-wire transmitter).

Life cycle

PREVIOUSLY

WITHDRAWN
IEC PAS 62382:2004 ED1

NOW

WITHDRAWN
IEC 62382:2006 ED1
99.60 Withdrawal effective
Nov 8, 2012

REVISED BY

WITHDRAWN
IEC 62382:2012 ED2