Telefon: (011) 7541-421, 3409-301, 3409-335, 6547-293, 3409-310
E-mail: Prodaja standarda: prodaja@iss.rs Seminari, obuke: iss-edukacija@iss.rs Informacije o standardima: infocentar@iss.rs
Stevana Brakusa 2, 11030 Beograd
Glavni meni

IEC 62382:2006 ED1

Electrical and instrumentation loop check
15. 11. 2006.

Опште информације

99.60     8. 11. 2012.

IEC

TC 65/SC 65E

Međunarodni standard

25.040.01  

engleski  

Kupovina

Revidiran

Jezik na kome želite da primite dokument.

Apstrakt

describes the steps recommended to complete a loop check, which comprises the activities between the completion of the loop construction (including installation and point-to-point checks) and the start-up of cold commissioning. Is applicable for the construction of new plants and for expansion/retrofits (i.e. revamping) of E&I installations in existing plants (including PLC, BAS, DCS, panel-mounted and field instrumentation). It does not include a detailed checkout of power distribution systems, except as they relate to the loops being checked (i.e. a motor starter or a power supply to a four-wire transmitter).

Životni ciklus

PRETHODNO

POVUČEN
IEC PAS 62382:2004 ED1

TRENUTNO

POVUČEN
IEC 62382:2006 ED1
99.60 Povlačenje stupilo na snagu
8. 11. 2012.

REVIDIRAN OD

POVUČEN
IEC 62382:2012 ED2