SRPS EN 50518-1:2013

Monitoring and alarm receiving centre - Part 1: Location and construction requirements

Aug 27, 2013
95.99   Withdrawal of Standard   Jan 31, 2020

General information

95.99     Jan 31, 2020

ISS

N079

European Norm

13.320  

English  

From plan 2010

Buying

Withdrawn

Language in which you want to receive the document.

Scope

This Part 1 of EN 50518 specifies the minimum requirements for the design, construction, and functioning equipment for premises where the monitoring, receiving and processing of (alarm) signals generated by alarm systems takes place as an integrated part of the total safety and security process. The requirements apply for applications in a remote configuration where multiple systems report to a single or multiple Alarm Receiving Centre(s) (ARC) as well as to a single site facility aimed for the monitoring and processing of alarms generated by one or more alarm systems installed within the perimeter of that particular site.

Life cycle

NOW

WITHDRAWN
SRPS EN 50518-1:2013
95.99 Withdrawal of Standard
Jan 31, 2020

REVISED BY

WITHDRAWN
SRPS EN 50518-1:2018

Related project

Adopted from EN 50518-1:2010

National regulations and standards

"Сл. гласник РС", бр. 71/2017 Сл. гласник РС, бр. 71/2017
Pravilnik o izmenama i dopunama Pravilnika o načinu vršenja poslova tehničke zaštite i korišćenja tehnički sredstava

МИНИСТАРСТВО УНУТРАШЊИХ ПОСЛОВА