Phone: (011) 7541-421, 3409-301, 3409-335, 6547-293, 3409-310
E-mail: Standards sales: prodaja@iss.rs Education: iss-edukacija@iss.rs Information about standards: infocentar@iss.rs
Stevana Brakusa 2, 11030 Beograd
Main menu

SRPS EN 50518-1:2018

Monitoring and alarm receiving centre - Part 1: Location and construction requirements

Jun 28, 2018
95.99   Withdrawal of Standard   Jan 31, 2023

General information

95.99     Jan 31, 2023

ISS

N079

European Norm

13.320  

English  

Buying

Withdrawn

Language in which you want to receive the document.

Scope

This part of EN 50518 specifies the minimum requirements for the design, construction, and functioning equipment for premises where the monitoring, receiving and processing of (alarm) signals generated by one or more intruder and hold-up alarm systems takes place as an integrated part of the total safety and security process. The requirements apply for applications in a remote configuration where multiple systems report to a single or multiple Alarm Receiving Centre(s) (ARC) as well as to a single site facility aimed for the monitoring and processing of alarms generated by one or more alarm systems installed within the perimeter of that particular site. This part of EN 50518 is to be read in conjunction with Part 2 and Part 3, and cannot be used separately.

Life cycle

PREVIOUSLY

WITHDRAWN
SRPS EN 50518-1:2013

NOW

WITHDRAWN
SRPS EN 50518-1:2018
95.99 Withdrawal of Standard
Jan 31, 2023

REVISED BY

PUBLISHED
SRPS EN 50518:2023

Related project

Adopted from EN 50518-1:2013