Search Serbian, European and international standards. Identify the standard organization, select the standard number or keyword, and complete the search you want. You can also add a standard drafting stage or a committee / national committee that drafted the standard
Portable multimedia equipment - Determination of battery duration - Part 1: Powered loudspeaker equipment
10.99 New project approved
Permanent magnet (magnetically hard) materials - Methods of measurement of the magnetic properties in an open magnetic circuit using a pulsed field magnetometer
10.99 New project approved
Medical electrical equipment - Functional performance characteristics for x-ray-based image-guided radiotherapy equipment
10.99 New project approved
Semiconductor devices - Semiconductor devices for iot system - Part 2: Test method of semiconductor photon sources incorporating human factors for wearable equipment
10.99 New project approved
Thermal standardization on semiconductor packages - Part 2-3: 3d thermal simulation models of semiconductor packages for steady-state analysis - Lqfp packages
10.99 New project approved
Thermal standardization on semiconductor packages - Part 6-2: Thermal resistance and capacitance model for transient temperature prediction at junction and measurement points - Model creation method using a measurement data of semiconductor device
10.99 New project approved
Energy efficiency - Customer energy management systems - Part 2-1: Data model and messaging - Interface between the distribution system operator/ energy management gateway and customer energy manager/ building energy manager (Proposed horizontal publication)
10.99 New project approved
Energy efficiency - Customer energy management systems - Part 3: Energy manager (Proposed horizontal publication)
10.99 New project approved
Photovoltaic power generating systems connection with grid - Testing of power conversion equipment - Part 2: Testing environment
10.99 New project approved
Ultrasonics - Shear-wave elastography - Part 2: Preparation and characterization of phantoms for performance and constancy testing
10.99 New project approved
Robotics for electricity generation, transmission and distribution systems - Wheeled, tracked or legged robots — part 3‑21: Overhead transmission line inspection robot - General requirements
10.99 New project approved
Robotics for electricity generation, transmission and distribution systems - Wheeled, tracked or legged robots - Part 3‑31: Land cable tunnel inspection robot - General requirements.
10.99 New project approved
Protective devices based on semiconductor technology for household and similar use - Part 1: Semiconductor residual current operated circuit-breakers with integral overcurrent protection for household and similar uses (SC-RCBOs)
10.99 New project approved
Leaky waveguide - Part 3: Sectional specification for rigid rectangular leaky waveguides
10.99 New project approved
Assessment of human exposure to electromagnetic fields from radiative wireless power transfer systems: Measurement and computational methods (Frequency Range of 30 MHz to 300 GHz)
10.99 New project approved
Semiconductor devices - Isolation for semiconductor devices - Part 1: Failure mechanisms and measurement methods to evaluate solid insulation for semiconductor devices
10.99 New project approved
Lighting systems - Electro-mechanical interfaces - Part 2-2: Two-contact and luminaire interface type zb20
10.99 New project approved
Lighting systems - Electro-mechanical interfaces - Part 2-3: Ans seven-contact twist-lock interface including type zb18n
10.99 New project approved