Search Serbian, European and international standards. Identify the standard organization, select the standard number or keyword, and complete the search you want. You can also add a standard drafting stage or a committee / national committee that drafted the standard
Energy efficiency - Customer energy management systems - Part 1: General requirements and architecture
50.60 Close of voting. Proof returned by secretariat
Energy efficiency - Customer energy management system - Part 2-2: Data model and messaging - Interface between the customer energy manager and resource managers
50.60 Close of voting. Proof returned by secretariat
High-voltage test techniques - Dielectric loss measurements "PROPOSED HORIZONTAL STANDARD"
40.60 Close of voting
Conductive charging of electric vehicles - Contact interface for automated connection device (ACD)
50.60 Close of voting. Proof returned by secretariat
Photovoltaic power generating systems connection with the grid - Testing of power conversion equipment- Part 1: General requirements
50.60 Close of voting. Proof returned by secretariat
Photovoltaic power generating systems connection with the grid - Testing for power conversion equipment - Part 5: Electromagnetic compatibility for low frequency conducted disturbances
40.60 Close of voting
Photovoltaic power generating systems connection with the grid - Testing of power conversion equipment - Part 7: Remote configuration, control and monitoring
40.60 Close of voting
Artificial pollution tests on high-voltage polymeric insulators to be used on AC and DC systems
10.99 New project approved
Fixed accessories intended for household and similar purposes that supply power through an interface
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Fixed accessories intended for household and similar purposes that supply power through an interface
40.60 Close of voting
Guideline for switching reliability evaluation procedures for gallium nitride power conversion devices
40.60 Close of voting
RTV silicone rubber coated insulators for AC and DC high-voltage applications - definitions, test methods and acceptance criteria
50.00 Final text received or FDIS registered for formal approval
Robotics for electricity generation, transmission and distribution systems - Part 2-1: General technical requirements for uas for overhead power lines inspection
40.20 DIS ballot initiated: 12 weeks
Ultrasonics - Measurement of temperature rise produced by medical ultrasonic equipment
40.20 DIS ballot initiated: 12 weeks
System referencing conductor switching device
50.60 Close of voting. Proof returned by secretariat
High pressure water jet machines - Safety - Part 1: High pressure water jet units
10.99 New project approved