Search Serbian, European and international standards. Identify the standard organization, select the standard number or keyword, and complete the search you want. You can also add a standard drafting stage or a committee / national committee that drafted the standard
Materials used in photovoltaic (PV) cells - Part 1: Specifications for electrical characteristics of crystalline silicon wafers
10.99 New project approved
Quantification and communication of carbon footprint, GHG emission reductions and avoided emissions from electric and electronic products and systems - Principles, methodologies, requirements and guidance
50.60 Close of voting. Proof returned by secretariat
Thermal standardization on semiconductor packages - Part 2-2: 3D thermal simulation models of semiconductor packages for steady-state analysis - PBGA and FBGA packages
40.60 Close of voting
Thermal standardization on semiconductor packages - Part 4: Thermal evaluation board specifications for fine pitch semiconductor packages
40.60 Close of voting
Thermal standardization on semiconductor packages - Part 6-1: Thermal resistance and capacitance model for transient temperature prediction at junction and measurement points - Model creation method using a datasheet of semiconductor device
40.60 Close of voting
Calculations of greenhouse gas (GHG) emissions throughout the liquefied natural gas (LNG) chain - Part 4: Shipping (ISO/FDIS 6338-4:2026)
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Calculations of greenhouse gas (GHG) emissions throughout the liquefied natural gas (LNG) chain - Part 5: Regasification (ISO/FDIS 6338-5:2026)
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Standard interface for connecting charging stations to local energy management systems - Part 1: General requirements, use cases and abstract messages
50.60 Close of voting. Proof returned by secretariat
Standard interface for connecting charging stations to local energy management systems - Part 2: Specific data model mapping
50.60 Close of voting. Proof returned by secretariat
Standard interface for connecting charging stations to local energy management systems - Part 3 Communication protocol and cybersecurity specific aspects
50.60 Close of voting. Proof returned by secretariat
Management of distributed energy storage systems based on electrically chargeable vehicle batteries - Part 1: Use cases and architectures
50.60 Close of voting. Proof returned by secretariat
Hybrid CPV/PV modules: General characteristics and measurement procedures - Part 1: Performance measurements and power rating - Irradiance and temperature
50.60 Close of voting. Proof returned by secretariat
Report on the development of cogeneration
10.99 New project approved
Sustainable management of waste electrical and electronic equipment (e-waste)
50.60 Close of voting. Proof returned by secretariat
Photovoltaic (PV) modules - Qualifying guidelines for increased hail resistance
10.99 New project approved
Corrigendum 1 - Photovoltaic (PV) modules - Qualifying guidelines for increased hail resistance
10.99 New project approved
Black start of hydropower plant
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks