Phone: (011) 7541-421, 3409-301, 3409-335, 6547-293, 3409-310
E-mail: Standards sales: prodaja@iss.rs Education: iss-edukacija@iss.rs Information about standards: infocentar@iss.rs Certification body: sertifikaciono.telo@iss.rs
Stevana Brakusa 2, 11030 Beograd
Main menu

Projects

Search Serbian, European and international standards. Identify the standard organization, select the standard number or keyword, and complete the search you want. You can also add a standard drafting stage or a committee / national committee that drafted the standard

Materials used in photovoltaic (PV) cells - Part 1: Specifications for electrical characteristics of crystalline silicon wafers

10.99   New project approved

N082 more

Quantification and communication of carbon footprint, GHG emission reductions and avoided emissions from electric and electronic products and systems - Principles, methodologies, requirements and guidance

50.60   Close of voting. Proof returned by secretariat

N040 more

Thermal standardization on semiconductor packages - Part 2-2: 3D thermal simulation models of semiconductor packages for steady-state analysis - PBGA and FBGA packages

40.60   Close of voting

N022 more

Thermal standardization on semiconductor packages - Part 4: Thermal evaluation board specifications for fine pitch semiconductor packages

40.60   Close of voting

N022 more

Thermal standardization on semiconductor packages - Part 6-1: Thermal resistance and capacitance model for transient temperature prediction at junction and measurement points - Model creation method using a datasheet of semiconductor device

40.60   Close of voting

N022 more

Calculations of greenhouse gas (GHG) emissions throughout the liquefied natural gas (LNG) chain - Part 4: Shipping (ISO/FDIS 6338-4:2026)

50.20   Proof sent to secretariat or FDIS ballot initiated: 8 weeks

M234 more

Calculations of greenhouse gas (GHG) emissions throughout the liquefied natural gas (LNG) chain - Part 5: Regasification (ISO/FDIS 6338-5:2026)

50.20   Proof sent to secretariat or FDIS ballot initiated: 8 weeks

M234 more

Standard interface for connecting charging stations to local energy management systems - Part 1: General requirements, use cases and abstract messages

50.60   Close of voting. Proof returned by secretariat

N021 more

Standard interface for connecting charging stations to local energy management systems - Part 2: Specific data model mapping

50.60   Close of voting. Proof returned by secretariat

N021 more

Standard interface for connecting charging stations to local energy management systems - Part 3 Communication protocol and cybersecurity specific aspects

50.60   Close of voting. Proof returned by secretariat

N021 more

Management of distributed energy storage systems based on electrically chargeable vehicle batteries - Part 1: Use cases and architectures

50.60   Close of voting. Proof returned by secretariat

N021 more

Hybrid CPV/PV modules: General characteristics and measurement procedures - Part 1: Performance measurements and power rating - Irradiance and temperature

50.60   Close of voting. Proof returned by secretariat

N082 more

Report on the development of cogeneration

10.99   New project approved

N005 more

Fire test for concentrator PV modules

10.99   New project approved

N082 more

Sustainable management of waste electrical and electronic equipment (e-waste)

50.60   Close of voting. Proof returned by secretariat

N040 more

Photovoltaic (PV) modules - Qualifying guidelines for increased hail resistance

10.99   New project approved

N082 more

Corrigendum 1 - Photovoltaic (PV) modules - Qualifying guidelines for increased hail resistance

10.99   New project approved

N082 more

Black start of hydropower plant

50.20   Proof sent to secretariat or FDIS ballot initiated: 8 weeks

N004 more