Search Serbian, European and international standards. Identify the standard organization, select the standard number or keyword, and complete the search you want. You can also add a standard drafting stage or a committee / national committee that drafted the standard
Biotechnology — Bioprocessing — Information requirements and considerations for single use bag assemblies
00.00 Proposal for new project received
Evaluation of the reusability of respiratory masks containing a nanofibre filter
00.00 Proposal for new project received
Defect analysis of single walled carbon nanotubes based on photoluminescence characteristics
00.00 Proposal for new project received
Sustainability principles applicable to steels for the reinforcement and prestressing of concrete
20.00 New project registered in TC/SC work programme
Solar energy — Test methods for pyranometer performance — Part 1: Response time
40.20 DIS ballot initiated: 12 weeks
Solar energy — Test methods for pyranometer performance — Part 2: Zero offset
20.60 Close of comment period
Solar energy — Test methods for pyranometer performance — Part 3: Non-stability
20.60 Close of comment period
Solar energy — Test methods for pyranometer performance — Part 4: Nonlinearity
30.60 Close of voting/ comment period
Solar energy — Test methods for pyranometer performance — Part 5: Directional response
30.60 Close of voting/ comment period
Solar energy — Test methods for pyranometer performance — Part 6: Spectral error
20.60 Close of comment period
Solar energy — Test methods for pyranometer performance — Part 7: Temperature response
30.60 Close of voting/ comment period
Solar energy — Test methods for pyranometer performance — Part 8: Tilt response
30.60 Close of voting/ comment period
Space systems — Design and verification requirements for fault diagnosability and reconfigurability of spacecraft
40.20 DIS ballot initiated: 12 weeks
Guidance on the use of smart contracts in contributing to the Sustainable Development Goals (SDGs)
60.00 Standard under publication
Smart contract security — Part 1: Secure development
20.20 Working draft (WD) study initiated
Smart contract security — Part 2: Code review
20.20 Working draft (WD) study initiated
Smart contract security — Part 3: Holistic diagnostic method
20.60 Close of comment period