Search Serbian, European and international standards. Identify the standard organization, select the standard number or keyword, and complete the search you want. You can also add a standard drafting stage or a committee / national committee that drafted the standard
Tissue Engineered Medical Products — Characterization and evaluation of silk fibroin as a starting material for TEMPs
00.60 Close of review
Guidelines for smart management of wastewater system
40.20 DIS ballot initiated: 12 weeks
Testing method for bead wire — Part 1: General requirements
50.00 Final text received or FDIS registered for formal approval
Testing method for bead wire — Part 2: Adhesion test
50.00 Final text received or FDIS registered for formal approval
Radiological protection — Radioactivity measurements — Methodology for the evaluation of the personal radon exposure
30.20 CD study/ballot initiated
Sustainable sports — State of the art for achieving and improving the sustainability of outdoor facilities
20.60 Close of comment period
Carbon footprint accounting and reporting of non-parallel steel wire and cords for tyre reinforcement
40.60 Close of voting
Purified water (PW) and water for injection (WFI) storage and distribution systems
40.20 DIS ballot initiated: 12 weeks
General requirements and quality inspection methods for parcel locker
30.60 Close of voting/ comment period
Parcel locker — Part 1: Interoperability
20.00 New project registered in TC/SC work programme
Ships and marine technology — Design requirements for windlasses and winches for low temperature operation
30.60 Close of voting/ comment period
Ships and marine technology — Jacking system appliance on self-elevating unit — Safety protection
30.99 CD approved for registration as DIS
Controls and protective devices for gaseous and liquid fuels — Material compatibility evaluation and qualification
30.99 CD approved for registration as DIS
Ships and marine technology — Roll on/Roll off ship-to-shore connection — Interface between terminals and ships with straight stern/bow ramps
10.60 Close of voting
Ships and marine technology — Ship's mooring and towing fittings — Double cruciform bollards
30.20 CD study/ballot initiated
Guidelines for treatment and reuse of petroleum refinery wastewater
40.20 DIS ballot initiated: 12 weeks
Assistive products — Guidelines on cognitive accessibility — Systems for taking medication
30.60 Close of voting/ comment period