Search Serbian, European and international standards. Identify the standard organization, select the standard number or keyword, and complete the search you want. You can also add a standard drafting stage or a committee / national committee that drafted the standard
Geometrical product specifications (GPS) — Surface texture: Areal — Part 6: Classification of methods for measuring surface topography
40.99 Full report circulated: DIS approved for registration as FDIS
Geometrical product specifications (GPS) — Surface texture: Areal — Part 607: Design and characteristics of non-contact (confocal microscopy) instruments
40.20 DIS ballot initiated: 12 weeks
Geometrical product specification (GPS) — Surface texture: Areal — Part 608: Design and characteristics of non-contact (digital holographic microscopy) instruments
20.00 New project registered in TC/SC work programme
Geometrical product specification (GPS) — Surface texture: Areal — Part 70: Material measures
40.60 Close of voting
Geometrical product specifications (GPS) — Surface texture: Areal — Part 701: Calibration of contact (stylus) instruments
20.00 New project registered in TC/SC work programme
Geometrical product specification (GPS) — Surface texture: Areal — Part 74: Software measurement standards
20.00 New project registered in TC/SC work programme
Ship and Marine Technology — Full scaled test for rotor sail
20.60 Close of comment period
Ecological networks — Mapping of standardization needs
50.00 Final text received or FDIS registered for formal approval
Traditional Chinese medicine — Requirement for (high-performance) thin-layer chromatography [(HP)TLC] identification methods for medicinal herbs and natural products
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Ships and marine technology — Sea trial methods for net energy-savings efficiency of air lubrication device
40.60 Close of voting
Radiological protection - Monitoring and internal dose assessment for radiation workers handling plutonium
30.60 Close of voting/ comment period
Rare Earth - Guidance for data collection and validation for the calculation of carbon footprint
30.60 Close of voting/ comment period
Prefabricated building — Volumetric prefabricated building — Concepts and general principles
40.20 DIS ballot initiated: 12 weeks
District heating and cooling supply network – Surveillance systems — Part 1: Electrical wire-based surveillance systems
00.00 Proposal for new project received
District heating and cooling supply network – Surveillance systems — Part 2: Optical fiber monitoring system
00.00 Proposal for new project received
District heating and district cooling networks----technical requirements for substations components
00.60 Close of review