Search Serbian, European and international standards. Identify the standard organization, select the standard number or keyword, and complete the search you want. You can also add a standard drafting stage or a committee / national committee that drafted the standard
Nanotechnologies — Nano-emulsions — Specifications of core characteristics and measurement methods
20.00 New project registered in TC/SC work programme
Road sweepers — Performance requirements and test methods
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Rolling bearings — Insert bearing units — Part 1: Geometrical product specifications (GPS) and tolerance values for insert bearings and eccentric locking collars
20.00 New project registered in TC/SC work programme
Rolling bearings — Insert bearing units — Part 2: Geometrical product specifications (GPS) and tolerance values for cast and pressed housings
20.00 New project registered in TC/SC work programme
Rolling bearings — Insert bearing units — Part 3: Boundary dimensions for mounting
00.00 Proposal for new project received
Spices and condiments — Whole, cut and ground lemongrass — Specification
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Health risk assessment and management of high-quality reuse of treated greywater during natural disasters, emergencies and crises
30.60 Close of voting/ comment period
Classification and Specification of Thermal Spray Seal Coatings for Gas Turbines — Low-temperature Applications
30.20 CD study/ballot initiated
Sustainable mobility and transportation — Photovoltaic power supply management for mobility — Part 1: Role model
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Sustainable mobility and transportation — Photovoltaic power supply management for mobility — Part 2: Data and platform
20.00 New project registered in TC/SC work programme
Prefabricated Building - Modular Building - Design
30.60 Close of voting/ comment period
Prefabricated Building - Modular Building - Kitchen and Bathroom
30.60 Close of voting/ comment period
Guidelines for hospital internal logistics services using autonomous mobile robots for the delivery of pharmaceuticals
40.60 Close of voting
Automation systems and integration — Core vocabulary for simulation data management
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Automation systems and integration - Industrial data - Industrial requirements for product data visualization and perspectives
00.00 Proposal for new project received
Cereals and cereal products — Common wheat (Triticum aestivum L.) — Determination of alveograph properties of dough at adapted hydration from commercial or test flours and test milling methodology
20.60 Close of comment period
Composites and reinforcements fibres — Determination of mode I fracture toughness of structural adhesive joints at high loading rates
50.00 Final text received or FDIS registered for formal approval