Search Serbian, European and international standards. Identify the standard organization, select the standard number or keyword, and complete the search you want. You can also add a standard drafting stage or a committee / national committee that drafted the standard
Electricity metering data exchange - The DLMS/COSEM suite - Part 8-5: Communication profile for G3-PLC and G3-Hybrid neighbourhood area networks
20.99 WD approved for registration as CD
Electricity metering equipment - Dependability - Part 31-1: Accelerated reliability testing - Elevated temperature and humidity
30.60 Close of voting/ comment period
Electricity metering equipment - Dependability - Part 32-1: Durability - Testing of the stability of metrological characteristics by applying elevated temperature
40.60 Close of voting
Amendment 1 - Medical device software - Requirements for the safety of radiotherapy treatment planning systems
40.00 DIS registered
Audio, video, and related equipment - Determination of power consumption - Part 1: General
30.60 Close of voting/ comment period
Audio, video, and related equipment - Determination of power consumption - Part 2: Signals and media
30.60 Close of voting/ comment period
Audio, video, and related equipment - Determination of power consumption - Part 3: Television sets
30.60 Close of voting/ comment period
Audio, video, and related equipment — Determination of power consumption — Part 8: Small Network Equipment
30.60 Close of voting/ comment period
Low-voltage switchgear and controlgear - Controllers for drivers of stationary fire pumps
20.99 WD approved for registration as CD
Safety of power converters for use in photovoltaic power systems - Part 1: General requirements
40.99 Full report circulated: DIS approved for registration as FDIS
Safety of power converters for use in photovoltaic power systems - Part 2: Particular requirements for inverters
40.99 Full report circulated: DIS approved for registration as FDIS
Amendment 1 - Safety of power converters for use in photovoltaic power systems - Part 3: Particular requirements for electronic devices in combination with photovoltaic elements
20.99 WD approved for registration as CD
Utility-interconnected photovoltaic inverters - Test procedure of islanding prevention measures
20.99 WD approved for registration as CD
Railway applications - Fixed installations - Electrical safety, earthing and the return circuit - Part 1: Protective provisions against electric shock
20.99 WD approved for registration as CD
Railway applications - Fixed installations - Electrical safety, earthing and the return circuit - Part 2: Provisions against the effects of stray currents caused by DC traction systems
20.99 WD approved for registration as CD
Railway applications - Fixed installations - Electrical safety, earthing and the return circuit - Part 3: Mutual interaction of AC and DC traction systems
20.99 WD approved for registration as CD
Integrated circuits - Measurement of electromagnetic immunity - Part 1: General conditions and definitions
30.20 CD study/ballot initiated
Secondary cells and batteries containing alkaline or other non-acid electrolytes - Safety requirements for portable sealed secondary lithium cells, and for batteries made from them, for use in portable applications - Part 2: Lithium systems
40.20 DIS ballot initiated: 12 weeks