Search Serbian, European and international standards. Identify the standard organization, select the standard number or keyword, and complete the search you want. You can also add a standard drafting stage or a committee / national committee that drafted the standard
Smart city system ontology – Part 4: Ontology for Positive Energy Districts
20.99 WD approved for registration as CD
Railway applications - Coordination requirements and energy-saving performance evaluation for Energy Feedback Systems in DC Traction Power Systems
30.99 CD approved for registration as DIS
User’s Quality of Experience (QoE) on Multimedia Conferencing Services - Part 3: Measurement methods
50.99 FDIS or proof approved for publication
Assessment of Human Exposure to Electromagnetic Fields from Radiative Wireless Power Transfer Systems: Measurement and Computational Methods (Frequency Range of 30 MHz to 300 GHz)
20.99 WD approved for registration as CD
Accessibility Goals and Needs with an exemplar of use with a household voice control system
30.60 Close of voting/ comment period
Methods for spectral imaging performance evaluation of computed tomography
40.60 Close of voting
Intelligent information request and delivery for digital information for use
30.60 Close of voting/ comment period
Railway applications - Technical criteria for the coordinations in neutral-section passing system for train
40.99 Full report circulated: DIS approved for registration as FDIS
Terms and Definition for standards incorporating power electronic conversion
30.60 Close of voting/ comment period
Semiconductor devices - Isolation for semiconductor devices - Part 1: Failure mechanisms and measurement methods to evaluate solid insulation for semiconductor devices
30.60 Close of voting/ comment period
Transformer bushings dimensional standardization - Part 2: High voltage bushings
30.60 Close of voting/ comment period
Railway application - Interoperability and safety requirements for dynamic wireless power transfer systems - Part 1: General requirements
40.99 Full report circulated: DIS approved for registration as FDIS
Interconnection of converter-based resources with power systems - Part 1: Grid connection requirements with bulk power systems
20.99 WD approved for registration as CD
Railway applications - System energy efficiency
50.00 Final text received or FDIS registered for formal approval
IEC TR 63500-1: Unified power flow controller (UPFC) installations - Part 1: Performance
20.99 WD approved for registration as CD
Calibration of the prompt fission neutron logging tools
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
200 MeV to 400 MeV superconducting proton cyclotron - General requirements and test methods
40.20 DIS ballot initiated: 12 weeks