Search Serbian, European and international standards. Identify the standard organization, select the standard number or keyword, and complete the search you want. You can also add a standard drafting stage or a committee / national committee that drafted the standard
Methods for spectral imaging performance evaluation of computed tomography
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Intelligent information request and delivery for digital information for use
40.00 DIS registered
Railway applications - Technical criteria for the coordinations in neutral-section passing system for train
40.99 Full report circulated: DIS approved for registration as FDIS
Terms and Definition for standards incorporating power electronic conversion
50.00 Final text received or FDIS registered for formal approval
Semiconductor devices - Isolation for semiconductor devices - Part 1: Failure mechanisms and measurement methods to evaluate solid insulation for semiconductor devices
30.60 Close of voting/ comment period
Transformer bushings dimensional standardization - Part 2: High voltage bushings
20.99 WD approved for registration as CD
Lighting systems - Electro-mechanical interfaces - Part 2-2: Two-contact and luminaire interface Type ZB20
20.99 WD approved for registration as CD
Lighting systems - Electro-mechanical interfaces - Part 2-3: ANS seven-contact twist-lock interface including Type ZB18N
20.99 WD approved for registration as CD
Railway application - Interoperability and safety requirements for dynamic wireless power transfer systems - Part 1: General requirements
40.99 Full report circulated: DIS approved for registration as FDIS
Interconnection of converter-based resources with power systems - Part 1: Grid connection requirements with bulk power systems
20.99 WD approved for registration as CD
Interconnection of converter-based resources with power systems - Part 10: Framework for the capability and performance of grid forming functions
20.99 WD approved for registration as CD
Interconnection of converter-based resources with power systems - Part 2: General requirements for marine energy generation
20.99 WD approved for registration as CD
Unified power flow controller (UPFC) installations - Part 1: Performance
30.20 CD study/ballot initiated
Unified power flow controller (UPFC) installations - Part 2: System design
30.60 Close of voting/ comment period
200 MeV to 400 MeV superconducting proton cyclotron - General requirements and test methods
50.00 Final text received or FDIS registered for formal approval
Test method for continuous-switching evaluation of gallium nitride power conversion devices
40.99 Full report circulated: DIS approved for registration as FDIS