Search Serbian, European and international standards. Identify the standard organization, select the standard number or keyword, and complete the search you want. You can also add a standard drafting stage or a committee / national committee that drafted the standard
Ferrite cores - Guidelines on dimensions and the limits of surface irregularities - Part 17: Balun-cores
30.20 CD study/ballot initiated
Electrical installations in ships – Primary and secondary DC distribution, system design architecture
30.60 Close of voting/ comment period
Photovoltaic (PV) arrays - Earth fault protection equipment - Safety and safety-related functionality
30.99 CD approved for registration as DIS
Secondary cells and batteries containing alkaline or other non-acid electrolytes - Sealed nickel-metal hydride cells and batteries for use in industrial applications - Part 1: Performance
50.00 Final text received or FDIS registered for formal approval
Secondary cells and batteries containing alkaline or other non-acid electrolytes - Sealed nickel-metal hydride cells and batteries for use in industrial applications - Part 2: Safety
50.00 Final text received or FDIS registered for formal approval
Lighting systems - General requirements
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Information exchange for electric vehicle charging roaming service Part 3: Message structure
30.20 CD study/ballot initiated
Guideline for System Design of HVDC converter stations - Part2: using Voltage Sourced Converters
30.20 CD study/ballot initiated
Application function blocks and logic diagrams in oil and gas, process and power industries - System control diagram - Part 1: General principles
40.60 Close of voting
Application function blocks and logic diagrams in oil & gas, process and power industries - System Control Diagram - Part 2: Diagram symbols and drawing principles
20.99 WD approved for registration as CD
Application function blocks and logic diagrams in oil & gas, process and power industries - System Control Diagram - Part 3: Application Function Blocks
30.60 Close of voting/ comment period
Guidance for installation procedures and tolerances of hydroelectric machines – Part 10: Main Inlet valve
20.99 WD approved for registration as CD
Guidance for installation procedures and tolerances of hydroelectric machines – Part 7: Horizontal generators
40.99 Full report circulated: DIS approved for registration as FDIS
Guidance for installation procedures and tolerances of hydroelectric machines – Part 8: Horizontal Francis turbines
40.99 Full report circulated: DIS approved for registration as FDIS
Guidance for installation procedures and tolerances of hydroelectric machines - Part 9: Horizontal Pelton Turbine
20.99 WD approved for registration as CD
Commercial Electric dishwashing machines - Test methods for measuring the performance
40.99 Full report circulated: DIS approved for registration as FDIS
Eyewear display - Part 20-10: Fundamental measurement methods - Optical properties
40.20 DIS ballot initiated: 12 weeks