Search Serbian, European and international standards. Identify the standard organization, select the standard number or keyword, and complete the search you want. You can also add a standard drafting stage or a committee / national committee that drafted the standard
Calibration and quality control in the use of radionuclide calibrators
50.60 Close of voting. Proof returned by secretariat
Leaky waveguides - Part 2: Sectional specification for elliptical leaky waveguides
50.99 FDIS or proof approved for publication
Leaky waveguide - Part 3: Sectional specification for rigid rectangular leaky waveguides
30.99 CD approved for registration as DIS
Systems Reference Document (SRD) Use Case Collection and Analysis: LVDC Systems for Public Electricity Distribution and distribution microgrids
20.99 WD approved for registration as CD
Cooking fume extractors - Methods for measuring the capture efficiency
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Smart city system ontology – Part 2: Guidance on ontology management for smart cities
50.00 Final text received or FDIS registered for formal approval
Smart city system ontology – Part 4: Ontology for Positive Energy Districts
40.99 Full report circulated: DIS approved for registration as FDIS
Railway applications – Fixed installations – Coordination requirements and energy-saving performance evaluation for energy feedback equipment in DC traction systems
40.99 Full report circulated: DIS approved for registration as FDIS
Assessment of Human Exposure to Electromagnetic Fields from Radiative Wireless Power Transfer Systems: Measurement and Computational Methods (Frequency Range of 30 MHz to 300 GHz)
30.99 CD approved for registration as DIS
Accessibility goals and needs with an exemplar of use with a household voice control system
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Methods for spectral imaging performance evaluation of computed tomography
60.00 Standard under publication
Intelligent information request and delivery for digital information for use
40.20 DIS ballot initiated: 12 weeks
Railway applications - Technical criteria for the coordinations in neutral-section passing system for train
40.99 Full report circulated: DIS approved for registration as FDIS
Terminology for standards incorporating power electronic conversion
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Semiconductor devices - Isolation for semiconductor devices - Part 1: Failure mechanisms and measurement methods to evaluate solid insulation for semiconductor devices
30.60 Close of voting/ comment period
Transformer bushings dimensional standardization - Part 2: High voltage bushings
30.20 CD study/ballot initiated
Lighting systems - Electro-mechanical interfaces - Part 2-2: Two-contact and luminaire interface Type ZB20
20.99 WD approved for registration as CD
Lighting systems - Electro-mechanical interfaces - Part 2-3: Seven-contact twist-lock interface Type ZB18N
20.99 WD approved for registration as CD