Phone: (011) 7541-421, 3409-301, 3409-335, 6547-293, 3409-310
E-mail: Standards sales: prodaja@iss.rs Education: iss-edukacija@iss.rs Information about standards: infocentar@iss.rs
Stevana Brakusa 2, 11030 Beograd
Main menu

Projects

Search Serbian, European and international standards. Identify the standard organization, select the standard number or keyword, and complete the search you want. You can also add a standard drafting stage or a committee / national committee that drafted the standard

Thermal standardization on semiconductor packages - Part 2-2: 3D thermal simulation models of semiconductor packages for steady-state analysis - PBGA and FBGA packages

50.99   FDIS or proof approved for publication

TC 47/SC 47D more

Thermal standardization on semiconductor packages - Part 4: Thermal evaluation board specifications for fine pitch semiconductor packages

50.99   FDIS or proof approved for publication

TC 47/SC 47D more

Thermal standardization on semiconductor packages - Part 6-1: Thermal resistance and capacitance model for transient temperature prediction at junction and measurement points - Model creation method using a datasheet of semiconductor device

60.00   Standard under publication

TC 47/SC 47D more

Power system stability and security management - Design and implement of automatic system - Coordinated Automatic Voltage Control for Power System with High Penetration of IBR (Inverter based Resource)

20.99   WD approved for registration as CD

TC 8/SC 8C more

Hybrid CPV/PV modules: General characteristics and measurement procedures - Part 1: Performance measurements and power rating - Irradiance and temperature

50.20   Proof sent to secretariat or FDIS ballot initiated: 8 weeks

TC 82 more

Black start of hydropower plant

40.99   Full report circulated: DIS approved for registration as FDIS

TC 4 more

Energy efficiency - Customer energy management systems - Part 2-1: Data model and messaging - Interface between the distribution system operator/ energy management gateway and customer energy manager/ building energy manager (Proposed horizontal publication)

20.99   WD approved for registration as CD

TC 23/SC 23K more

Energy efficiency - Customer energy management system - Part 2-2: Data model and messaging - Interface between the customer energy manager and resource managers

60.00   Standard under publication

TC 23/SC 23K more

Energy Efficiency - Customer Energy Management Systems - Part 3: Energy Manager (Proposed horizontal publication)

30.20   CD study/ballot initiated

TC 23/SC 23K more

High-voltage test techniques - Dielectric loss measurements "PROPOSED HORIZONTAL STANDARD"

40.60   Close of voting

TC 42 more

Draft proposal for a PAS on Intelligent Information Request and Delivery Specification<br /> (iiRDS) -A Process Model for Information Architecture

50.20   Proof sent to secretariat or FDIS ballot initiated: 8 weeks

TC 3 more

Conductive charging of electric vehicles - Contact interface for automated connection device (ACD)

50.20   Proof sent to secretariat or FDIS ballot initiated: 8 weeks

TC 23/SC 23H more

Photovoltaic power generating systems connection with the grid - Testing of power conversion equipment- Part 1: General requirements

50.00   Final text received or FDIS registered for formal approval

TC 82 more

Photovoltaic power generating systems connection with grid - Testing of power conversion equipment - Part 2: Testing environment

20.99   WD approved for registration as CD

TC 82 more

Photovoltaic power generating systems connection with grid - Conformity assessment for power conversion equipment - Part 4: Interface protection and fault ride through

20.99   WD approved for registration as CD

TC 82 more

Photovoltaic power generating systems connection with the grid - Testing for power conversion equipment - Part 5: Electromagnetic compatibility for low frequency conducted disturbances

30.99   CD approved for registration as DIS

TC 82 more

Photovoltaic power generating systems connection with the grid - Testing of power conversion equipment- Part 6: Power control functions and grid support

40.20   DIS ballot initiated: 12 weeks

TC 82 more

Photovoltaic power generating systems connection with the grid - Testing of power conversion equipment- Part 7: Remote configuration, control and monitoring

40.20   DIS ballot initiated: 12 weeks

TC 82 more