Telefon: (011) 7541-421, 3409-301, 3409-335, 6547-293, 3409-310
E-mail: Prodaja standarda: prodaja@iss.rs Seminari, obuke: iss-edukacija@iss.rs Informacije o standardima: infocentar@iss.rs
Stevana Brakusa 2, 11030 Beograd
Glavni meni

Projekti

Pretražite srpske, evropske i međunarodne standarde. Odredite organizaciju koja je donosilac standarda, izaberite oznaku standarda ili ključnu reč i završite željenu pretragu. Možete dodati i fazu u izradi standarda ili komitet/komisiju koja je izradila standard.

Thermal standardization on semiconductor packages - Part 2-2: 3D thermal simulation models of semiconductor packages for steady-state analysis - PBGA and FBGA packages

50.99   Definitivni tekst nacrta standarda odobren za objavljivanje

TC 47/SC 47D Saznaj više

Thermal standardization on semiconductor packages - Part 4: Thermal evaluation board specifications for fine pitch semiconductor packages

50.99   Definitivni tekst nacrta standarda odobren za objavljivanje

TC 47/SC 47D Saznaj više

Thermal standardization on semiconductor packages - Part 6-1: Thermal resistance and capacitance model for transient temperature prediction at junction and measurement points - Model creation method using a datasheet of semiconductor device

60.00   Standard u postupku objavljivanja

TC 47/SC 47D Saznaj više

Power system stability and security management - Design and implement of automatic system - Coordinated Automatic Voltage Control for Power System with High Penetration of IBR (Inverter based Resource)

20.99   Prednacrt standarda prihvata se kao nacrt standarda

TC 8/SC 8C Saznaj više

Hybrid CPV/PV modules: General characteristics and measurement procedures - Part 1: Performance measurements and power rating - Irradiance and temperature

50.20   Početak postupka odobravanja definitivnog teksta nacrta standarda

TC 82 Saznaj više

Black start of hydropower plant

40.99   Nacrt standarda prihvata se kao definitivni tekst nacrta standarda

Energy efficiency - Customer energy management systems - Part 2-1: Data model and messaging - Interface between the distribution system operator/ energy management gateway and customer energy manager/ building energy manager (Proposed horizontal publication)

20.99   Prednacrt standarda prihvata se kao nacrt standarda

TC 23/SC 23K Saznaj više

Energy efficiency - Customer energy management system - Part 2-2: Data model and messaging - Interface between the customer energy manager and resource managers

60.00   Standard u postupku objavljivanja

TC 23/SC 23K Saznaj više

Energy Efficiency - Customer Energy Management Systems - Part 3: Energy Manager (Proposed horizontal publication)

30.20   Početak izjašnjavanja o nacrtu komisije standarda

TC 23/SC 23K Saznaj više

High-voltage test techniques - Dielectric loss measurements "PROPOSED HORIZONTAL STANDARD"

40.60   Završetak javne rasprave

TC 42 Saznaj više

Draft proposal for a PAS on Intelligent Information Request and Delivery Specification<br /> (iiRDS) -A Process Model for Information Architecture

50.20   Početak postupka odobravanja definitivnog teksta nacrta standarda

Conductive charging of electric vehicles - Contact interface for automated connection device (ACD)

50.20   Početak postupka odobravanja definitivnog teksta nacrta standarda

TC 23/SC 23H Saznaj više

Photovoltaic power generating systems connection with the grid - Testing of power conversion equipment- Part 1: General requirements

50.00   Evidentiranje podataka o definitivnom tekstu nacrta standarda

TC 82 Saznaj više

Photovoltaic power generating systems connection with grid - Testing of power conversion equipment - Part 2: Testing environment

20.99   Prednacrt standarda prihvata se kao nacrt standarda

TC 82 Saznaj više

Photovoltaic power generating systems connection with grid - Conformity assessment for power conversion equipment - Part 4: Interface protection and fault ride through

20.99   Prednacrt standarda prihvata se kao nacrt standarda

TC 82 Saznaj više

Photovoltaic power generating systems connection with the grid - Testing for power conversion equipment - Part 5: Electromagnetic compatibility for low frequency conducted disturbances

30.99   Nacrt komisije standarda odobrava se za javnu raspravu

TC 82 Saznaj više

Photovoltaic power generating systems connection with the grid - Testing of power conversion equipment- Part 6: Power control functions and grid support

40.20   Nacrt na javnoj raspravi 60 dana

TC 82 Saznaj više

Photovoltaic power generating systems connection with the grid - Testing of power conversion equipment- Part 7: Remote configuration, control and monitoring

40.20   Nacrt na javnoj raspravi 60 dana

TC 82 Saznaj više