Telefon: (011) 7541-421, 3409-301, 3409-335, 6547-293, 3409-310
E-mail: Prodaja standarda: prodaja@iss.rs Seminari, obuke: iss-edukacija@iss.rs Informacije o standardima: infocentar@iss.rs
Stevana Brakusa 2, 11030 Beograd
Glavni meni

IEC 61850-7-410:2012 ED2

Communication networks and systems for power utility automation - Part 7-410: Basic communication structure - Hydroelectric power plants - Communication for monitoring and control
12. 11. 2015.

Опште информације

60.60     30. 10. 2012.

IEC

TC 57

Međunarodni standard

33.200  

engleski   francuski  

Kupovina

Objavljen

Jezik na kome želite da primite dokument.

Apstrakt

IEC 61850-7-410:2012 specifies the additional common data classes, logical nodes and data objects required for the use of IEC 61850 in a hydropower plant. The main changes with respect to the previous edition are as follows:
- the logical nodes in IEC 61850-7-410:2007 that were not specific to hydropower plants have been transferred to IEC 61850-7-4:2010;
- the definitions of logical nodes in this edition of IEC 61850-7-410 have been updated;
- most of the modelling examples and background information included in IEC 61850-7-410:2007 have been transferred to IEC/TR 61850-7-510.
This new edition of IEC 61850-7-410 includes additional general-purpose logical nodes that were not included in IEC 61850-7-4:2010, but are required in order to represent the complete control and monitoring system of a hydropower plant.

Životni ciklus

PRETHODNO

POVUČEN
IEC 61850-7-410:2007 ED1

TRENUTNO

OBJAVLJEN
IEC 61850-7-410:2012 ED2
60.60 Standard objavljen
30. 10. 2012.

ISPRAVKE / IZMENE

OBJAVLJEN
IEC 61850-7-410:2012/AMD1:2015 ED2

REVIDIRAN OD

PROJEKAT
IEC 61850-7-410 ED3