Telefon: (011) 7541-421, 3409-301, 3409-335, 6547-293, 3409-310
E-mail: Prodaja standarda: prodaja@iss.rs Seminari, obuke: iss-edukacija@iss.rs Informacije o standardima: infocentar@iss.rs
Stevana Brakusa 2, 11030 Beograd
Glavni meni

IEC TS 61400-26-2:2014 ED1

Wind turbines - Part 26-2: Production-based availability for wind turbines
4. 6. 2014.

Опште информације

99.60     29. 5. 2019.

IEC

TC 88

Tehnička specifikacija

27.180  

engleski  

Kupovina

Zamenjen

Jezik na kome želite da primite dokument.

Apstrakt

IEC TS 61400-26-2:2014 provides a framework from which production-based performance indicators of a wind turbine generator system can be derived. It unambiguously describes how data is categorised and provides examples of how the data can be used to derive performance indicators. The approach of this part of IEC 61400 is to expand the time allocation model, introduced in IEC TS 61400-26-1, with two additional layers for recording of the actual energy production and potential energy production associated with the concurrent time allocation. This document also includes informative annexes with:
- examples of determination of lost production,
- examples of algorithms for production-based indicators,
- examples of other performance indicators,
- examples of application scenarios.

Životni ciklus

TRENUTNO

POVUČEN
IEC TS 61400-26-2:2014 ED1
99.60 Povlačenje stupilo na snagu
29. 5. 2019.

REVIDIRAN OD

OBJAVLJEN
IEC 61400-26-1:2019 ED1