Revidiran
Specifies the general requirements for electrical fast transient immunity tests for measuring relays and protection equipment for power system protection, including the control, monitoring and process interface equipment used with these systems. Is based on IEC 61000-4-4.
POVUČEN
IEC 60255-22-4:1992 ED1
POVUČEN
IEC 60255-22-4:2002 ED2
99.60
Povlačenje stupilo na snagu
14. 4. 2008.
POVUČEN
IEC 60255-22-4:2008 ED3