Search Serbian, European and international standards. Identify the standard organization, select the standard number or keyword, and complete the search you want. You can also add a standard drafting stage or a committee / national committee that drafted the standard
Amendment 1 - Managing fire risk related to photovoltaic (PV) systems on buildings
50.00 Final text received or FDIS registered for formal approval
Live working - Hand protective devices against the thermal hazards of an electric arc - Part 2: Requirements
20.99 WD approved for registration as CD
Radio frequency beam wireless power transfer (WPT) for mobile devices
50.60 Close of voting. Proof returned by secretariat
Amendment 1 - Electric motor-operated tools - Dust measurement procedure - Part 1: General requirements
30.99 CD approved for registration as DIS
Amendment 1 - Electric motor-operated tools - Dust measurement procedure - Part 2-22: Particular requirements for hand-held cut-off machines and wall chasers
30.99 CD approved for registration as DIS
Amendment 1 - Electric motor-operated tools - Dust measurement procedure - Part 2-3: Particular requirements for hand-held concrete grinders and disc-type sanders
30.99 CD approved for registration as DIS
Amendment 1 - Electric motor-operated tools - Dust measurement procedure - Part 2-4: Particular requirements for hand-held sanders
30.99 CD approved for registration as DIS
Amendment 1 - Electric motor-operated tools - Dust measurement procedure - Part 2-6: Particular requirements for hand-held hammers
30.99 CD approved for registration as DIS
CDD Database - Cable tray systems and cable ladder systems
30.99 CD approved for registration as DIS
Fibre optic interconnecting devices and passive components – Connector optical interfaces for enhanced macrobend multimode fibres – Part 3-1: Connector parameters of physically contacting 50 µm core diameter fibres – Non-angled 2,5 mm and 1,25 mm diameter cylindrical full zirconia ferrules
40.99 Full report circulated: DIS approved for registration as FDIS
Fibre optic interconnecting devices and passive components - Connector optical interfaces for enhanced macrobend multimode fibres - Part 3-31: Connector parameters of physically contacting 50 μm core diameter fibres - Non-angled polyphenylene sulphide rectangular ferrules with a single row of 12, 8, 4, or 2 fibres
20.99 WD approved for registration as CD
Fibre optic interconnecting devices and passive components – Connector optical interfaces for enhanced Macro bend multimode fibre – Part 3-82: Connector parameters of physically contacting 50 μm core diameter fibres – Non-angled polyphenylene sulphide rectangular ferrules with a single row of 16 fibres for reference connector applications
40.00 DIS registered
Amendment 1 - Fibre optic interconnecting devices and passive components - Fibre optic connector optical interfaces for enhanced macrobend multimode fibres - Part 3-61: Connector parameters of physically contacting 50 μm core diameter fibres - Non-angled 2,5 mm and 1,25 mm diameter cylindrical full zirconia ferrules for reference connection applications
30.60 Close of voting/ comment period
Amendment 1 - Fibre optic interconnecting devices and passive components - Connector optical interfaces for enhanced macro bend multimode fibre - Part 3-81: Connector parameters of physically contacting 50 μm core diameter fibres - Non-angled polyphenylene sulphide rectangular ferrules with a single row of 12, 8, 4, or 2 fibres for reference connector applications
30.60 Close of voting/ comment period
Industrial automation equipment and systems – Part 2: Algorithm Verification Methods
40.00 DIS registered
Systems Reference Deliverable (SRD) - Use Case Collection and Analysis: City Information Modelling - Part 2 : Use Case Analysis
20.99 WD approved for registration as CD
Asset Administration Shell for Industrial Applications – Part 2: Information meta model
40.20 DIS ballot initiated: 12 weeks
Asset Administration Shell for Industrial Applications – Part 3: Security provisions for Asset Administration Shells
30.60 Close of voting/ comment period